The survey we were given was four years old. Standing on the site with it, the discrepancy was immediately obvious: the crest marked on the drawing was now eleven metres inland and two metres higher.

Surveying something that will not hold still

We stopped trying to record the dune and recorded its limits instead. Four years of aerial imagery gave us the furthest landward and seaward positions the crest had taken. The building was then set outside both.

This produced a worse view and a better building. Had we sited it on the crest as surveyed, the pavilion would have been standing in a hollow within a decade.

The practical lesson

On any site that moves, ask for the history rather than the state. A single survey of a shifting landscape is not a measurement, it is a photograph.